Project Overview

In the global development of mineral resources, power supply remains the core lifeline for ensuring production safety. Mining operations often face three major energy challenges: remote location far from urban power grids, harsh climate with extreme temperature variations, and the demand for 24/7 continuous power supply. The Startight's Power technical team tailored a matrix of eight 2250kVA high-voltage generator sets for a specific mining project, utilizing MTU series engines and Stamford series generators. The entire system adopts a breakthrough modular integrated design, achieving four major technological innovations within a standard 40-foot container.

Technical Overview

Engine: MTU 16V4000G23F 3B

Generator: Stamford S9H1D-B42

Heavy-Duty Air Filter: Donaldson G180031 * 4Pcs

Circuit Breaker: ABB

Project Challenges

Remote location far from urban power grids.

Harsh climate with extreme temperature variations.

Demand for 24/7 continuous power supply.

Production Timeline

Engineering Design & Customization: 16 days

Manufacturing & Assembly: 30 days

System Integration & Testing: 15 days

Total Delivery Cycle: 2 months